x

Supervision and Monitoring of a  construction of multiple-circuit highway interchange and its ramps

Country of achievement
Mali
Client
AGEROUTE MALI
Start date
2009
Expiration date
2010
Global budget
574 millions de FCFA (875 057 €)

Project Background :

The overall objective of the project is to ensure traffic decongestion within the city of Bamako, ensure road users and citizen’s safety in general and finally, building modern structures to improve  life quality in urban areas.

The project consists of the construction of a highway multiple interchange and access ramps in a total length of 4.7 km, and four (4) structures (slab bridges and frame bridges ranging in a length from 19.90 m to 61 m).